Stageline have established a record for the fastest set up and tear down for a large concert stage ever done at the MetLife Stadium. Set up was done in 16 hours with a crew of 16 stagehands and tear down in 12 hours with the SAM 750, a game changer in the world of large concert stages. Stageline stage helps you optimize your calendar by inserting concerts between sporting events. No surprises, no delays. Stageline mobile stages are an alternative to the constructed stages. They deliver quick set-ups and are engineered for the most complex and demanding productions and tight schedules.
SIZES
20’ x 16′ to 130’ x 56’
6m x 5m to 40m x 17m
RIGGING
4,250 lbs to 152,000 lbs
1,928 kg to 68,946 kg
MASSIVE SAVINGS
Stages reducing event set-up time and labor by 75-90% resulting in serious savings on set up cost, production calls, machinery and safety.
SUPERIOR RIGGING CAPACITY
Safe and easy to rig. No need to climb or bridle. All motors and pick points are installed at deck level. All models are built and tested with the highest load and design criteria in the industry-up to 2 times the permitted load.
CUSTOM LAYOUT
With the same flexible Stageline deck systems, your configurations are done, rapidly. Production techs can start activities on their respective surfaces early on in the setup. Cross-over and ramp move around according to your needs, all in short hour delivery.
SAFE DEPLOYMENT
Your stage is pre-engineered and safety levels are greatly improved with redundant safety measures. Staff, talent, crew, equipment, instruments, name it, all safely interacting in a smooth setup process. Most of the work is done at deck level reducing the risk of potential human error and accidents.
WEATHER & SAFETY
Superior weatherproofing of the stage and large work areas. The wind resistance is up to 115 mph (185 km/h). Our techs are trained & backed by weather monitoring at Weather Ops to always be ahead of the storm and keep you safe at all times.
LOGISTICAL SUPPORT
Experienced in-house logistics support team and stage technicians recognized in the industry for their professionalism and know-how.
ENGINEERING CERTIFICATIONS
The engineering calculations and certifications adhere to strict norms at IBC and NBC building codes for wind mainly and are in line with OSHA onsite requirements.
NO SOIL DISTURBANCE
Do not worry about your game surface. Stageline stages are self-standing structures. No ballasting or anchoring are needed.
To this day, Stageline stages are in over 50 countries
and can be delivered anywhere in the world.
With a fleet of over 100 units and a strong network of owners and joint venture partnters,
Stageline offers the widest coverage in North America.